お気軽にお問い合せください
05224250010522425003 受付時間 8:30~17:30(土日祝日を除きます) E-mail:info@hodumi.co.jp

Pile Driver KH800 Maruzenkogyo 商品番号:MAR-019E

Strong impact power even in cold weather

・Can be used to drive guard rail pipes and H steels easily.
To drive H steel (100×100, 150×150), optional cap adapter is necessary.

・Able to use PTO port on excavator or crane as power source.

・Perfect for driving large diameter pipes, pine cones concrete piles, etc.
Standard cap adapter is Φ155 mm flat type.

Please let us know if you want to ask more...
・your information(name, address, telephone number)
・quantity
・delivery address

販売単位:
価格:
お問合せください

MODEL KH800  
dimensions(mm) 767×359×310
weight(kg)  114(not including driving tool and hook)
working pressure(MPa) 9.8~14.7
maximum intake pressure(MPa) 27.5
flow range/pressure ①20~25ℓ/min →500~600bpm
②25~35ℓ/min →600~950bpm
(it needs the change of orifice plug to convert from ① to ② and vise verse)
max driving dia(mm) φ150
coupling 3/8inch couplers
driving option toolfor guard rail : 114.3mm, 139.8mm
for h steel : 100mmsruare
recommended oil ISO VG32(Standard), ISO VG46 orequivalant
max hose length(m)  20~25ℓ/min 3/8"×10
25~30ℓ/min 1/2"×10
blow per minute(bpm)1080

HOW TO USE

Always check and confirm the using power source is complied with the specifications of this pile driver.

Preparation
1. Check and confirm if the Driving Tool is fit for the pile you intend to drive.
Change the tool if necessary.
STD: ID 150mm Option: For Guard Rail Post/ H Steel.
Always apply 5g grease on tool shank and grease up 4-5 times by grease gun through the hole of front end and set the tool with retainer pin and spring pin when you use it.

2. Connect the pile driver to hydraulic power source and remote control valve with extension hoses which is always to be machine side.
At this time, remote valve must be in OFF position.

3. Use wire to lift the pile driver (See Fig. )

4. Place pile vertically on the point which you intended to drive in.
Set the pile driver on the top of pile. Be cautious not to let the pile driver falls.

Operation
5. Start the power source.

6. Loose the lifting wire slowly.

7. Turn the lever of remote valve to ON position, and the pile driver start working.
Make sure that pile stays vertically without inclination

8. While pile has been driven into the desired depth, Stop the pile driver by turning the lever of remote valve to OFF position.

After Operation
9. After operation stop the power source.

10. Stop the power source and detach the connection hoses and control valve.

11. Clean each component and part of pile driver.

MAINTENANCE

1. Daily inspection
(1) Check if there are no oil leakage or spoil on the body and hoses of pile driver.
(2) Check if there are no cracks or damages on hook.
(3) Check if there are no loosen nuts on post cover.
(4) Check if the remote valve moves smoothly.

2. Periodical inspection
Ask your dealer for the periodical inspections.

管理番号:1882
受付時間:8:30~17:30
(土日祝及びGW・夏季休暇・年末年始は休み)
お問い合せ